Charging where logistics happens.
From grid analysis to daily operations — nanuq plans, builds, and operates charging infrastructure tailored exactly to your fleet.
We guide you — from analysis to operations.
Analysis
Planning
Permitting
Construction
Commissioning
Operations
Economically planned.
Precisely dimensioned for your needs.
Built for operational reliability.
Hardware, software, and energy perfectly integrated.
Future-proof.
Expandable for more vehicles, more power, and new technologies.
Everything it takes to run an electric truck fleet.
Hardware-neutral selection, planned and built from one partner. Nothing more and nothing less than what your e-fleet actually needs.
Charging infrastructure
Charging stations, transformer, grid connection, civil works, commissioning.
PV
Solar installations on depot roofs and open areas.
BESS
Battery storage for peak shaving and grid relief.
Mobile charging solution
Temporary or modular charging infrastructure for bridging and bottleneck situations.
Legal metrology
Metering and billing set up for settlement-grade, legally compliant charging.
arctiqOS
Software anchor across the entire portfolio — for daily operations and as a transformation companion.
Infrastructure tailored to your fleet.
From grid analysis to daily operations — four systems that work together.
Grid analysis
Before construction begins.
- Existing connection capacity and reserves
- Load profiles across daily/weekly cycles
- Requirements for transformer substations and storage
- Permit-relevant framework conditions
- Expansion stages for growing fleets

Depot charging infrastructure
Charging where logistics happens.
- AC and DC charge points as needed
- Civil engineering and cable routing
- Calibration-compliant hardware
- arctiqOS integration from day one
- Scaling for additional vehicles and charge points

Operations & service
We take responsibility.
- 24/7 remote monitoring of all charge points
- Proactive fault detection and resolution
- Regular maintenance and inspection
- Software updates via arctiqOS
Storage & transformer technology
Power buffer for grids and costs.
Battery storage reduces demand charges and stabilizes grid connections. Transformer substations deliver the required power for the depot.

From wallbox to megawatt charger.
nanuq plans and installs the right charging technology for every use case.

AC charging
Vehicles with long dwell times — overnight charging at the depot, employee parking
up to 43 kW

DC charging
Faster charging with shorter dwell times — interim charging at the depot or on the road
up to 400 kW

HPC charging
High-traffic locations — logistics centres, public charging hubs
up to 600 kW

MCS charging
Heavy commercial vehicles — Megawatt Charging for trucks in minutes
up to 1,440 kW
Electrification only works as a system.
What does your depot look like electrified?
Start with a fleet analysis — and find out what your infrastructure could look like.
Free & non-binding.

